126 Simcoe
Three minutes to St. Andrew station, a 16th-floor rooftop plunge pool and fire pits; large columns in the layouts, slow elevators, and Ontario Line construction next door that can run in the small hours.
Good points
- Three minutes to St. Andrew station
- Queen and King streetcars
- 16th-floor rooftop plunge pool, cabanas and fire pits
Problems
- Ontario Line construction, with drilling even in the early morning
- Garbage trucks, delivery vans and sirens
- Large columns inside units get in the way of furniture
- 34 storeys; slow elevators
Some items are compiled from public notes and posts and translated from Chinese. Older experiences may not reflect the building today; check recent repairs and management when you view. These items are awaiting residents’ votes.
Official records
Fire inspections: 4 in the last 2 years, 4 with findings; 14 since 2019, 9 with findings, 34 items in all; latest closed 2026-05-12 with 14 items; none went to enforcement. Common findings: Fire door upkeep ×4, Smoke control system test records ×3, Fire safety plan ×3. Findings must be fixed before a case closes, so they may not exist today.
Records are matched by address and may be off.
Open this building