Ellie Condos
A 2025 building with a direct subway link and lots of places to eat on Yonge St; according to public reports the developer went through bankruptcy restructuring, and residents have reported leaks and power outages since handover.
Good points
- Direct subway link
- Lots of food choices on Yonge St
Problems
- Some residents have had leaks and power outages
- Elevator breakdowns are fairly common; often out of service
- Average floor soundproofing; footsteps upstairs are clearly heard
- The pool and some other planned amenities were not delivered
- Maintenance fees are on the high side for comparable new buildings
Some items are compiled from public notes and posts and translated from Chinese. Older experiences may not reflect the building today; check recent repairs and management when you view. These items are awaiting residents’ votes.
Official records
Fire inspections: 2 in the last 2 years, 1 with findings; 4 since 2024, 2 with findings, 13 items in all; latest closed 2026-05-20 with 9 items; none went to enforcement. Common findings: City fire bylaw ×2, Required checks and tests not done ×2, Missing records ×1. Findings must be fixed before a case closes, so they may not exist today.
Records are matched by address and may be off.
Open this building